Fixed with Locational Marginal Price (LMP) + adder above block


Electric generation is purchased in a fixed block (both time and quantity) at a fixed price.  The charge will be LMP + adder for any additional electricity consumed outside the block. 

  • Limits your exposure to price volatility
  • Takes advantage of lower-cost power during off-peak periods 

       

      (05/31/07)